Thread
:
The fabrication thread.
View Single Post
06-22-2008, 09:52 PM
#
703
DisEpyon
Zilvia Junkie
Join Date: Jun 2005
Location: ?
Posts: 574
Trader Rating: (
0
)
A recent job i did today. been pretty busy with my car trying to get it done, but im never to busy for jobs like these.
welded up intercooler piping, brackets for the intercooler, blow off valve flange, and had to modify tabs for the radiators.
The intercooler piping. customer taped it up for me and cut squares out for me to tack.
All tacked up.
All welded up.
The brackets for the intercooler.
Each radiator had one tab that needed to be modified to fit the car's going on.
The blow of valve flange welded up (it will be welded to the pipe later on). ( the tubing was a little bit smaller in diameter from the bov hole, but that did not stop me.)
In the end another happy customer. went to his house and everything fitted great.
DisEpyon
View Public Profile
Find More Posts by DisEpyon