BioSehnsucht
05-06-2004, 09:15 PM
I'd prefer an uncut, but I'll take the cut as long as you have both halves. I've got two cut engine-half harnesses (no MAF harness connection it was cut off too, and might be missing one or two other things).
Time frame is basicly anytime in the next 4-5 weeks, I want to have time to get the harness patched up before the motor is ready to go in the car, and my pistons will be 5-6 weeks..
PM me, or email me at [email protected]
Time frame is basicly anytime in the next 4-5 weeks, I want to have time to get the harness patched up before the motor is ready to go in the car, and my pistons will be 5-6 weeks..
PM me, or email me at [email protected]